In order to elevate our level of efficiency in terms of performance, we have developed a sound infrastructure base. Spread over a plot area of 2500 unit, our world class infrastructure facilities divided into the following departments:
Production house (With in house design unit and CAD/CAM facility)
R & D department
Quality control unit
Packaging unit
Shipment department
Our production house is equipped with requisite machinery that assists us in designing a quality assured range of measuring instrument, flow measuring instrument, digital measuring instrument and flow sensors.
Following are some of the machines installed at our unit:
Drilling machine
Molding machine
Soldering machine
Multi meter
Lathe machine
Instrumentation facility
VMC machines
Windsor machines
These hi-tech machines enable us in having a production capacity of 2500 units per month. In addition to these, we are also backed by calibration facilities that facilitate us in accomplishing first principle with water available till 100 cubic meters per hour flow. This process is verified by reputed institutes like CWPRS. These modern facilities allow us in executing our projects in minimum turnaround time and promise our clients with a lead time of 21 days for delivery.